Home » Info meeting on two bridge jobs

Info meeting on two bridge jobs

CORNWALL — A public information meeting will be hosted by the Department of Transportation (DOT) at Town Hall at 7 p.m. Thursday, Sept. 29.DOT representatives will offer details and answer questions about two bridge replacement projects slated to begin in spring 2014.Project No. 31-127 is the rebuilding of a Route 4 bridge over Bloody Brook, near the intersection of West Road (just south of Foote Fields). The superstructure is listed as being in poor condition. The 12-foot-long bridge will be widened from 28.3 feet to 34 feet, with a concrete slab on concrete abutments. The cost is estimated at $1.5 million.Project No. 31-128 is on Route 43 over a tributary of the Hollenbeck River. The 8-foot-long span’s superstructure was determined to be in a seriously deteriorated condition. The plan is to widen it by 5 inches to 30 feet and build a concrete slab deck on stone masonry abutments. The cost is estimated at $1 million.Both roads will be single lane during construction. Project costs will be paid for with state and federal funding. Plans are available for review at Town Hall.

More Information

TriCorner News

Copyright The Lakeville Journal
860-435-9873
PO Box 1688, Lakeville, CT 06039
All Rights Reserved

Membership